|












 | | 
THE QUICK, COST-EFFICIENT SURFACE RECONSTRUCTION SYSTEM

THE PROBLEM
When major surface reconstruction is required, conventional approaches mean extensive planning, traffic delays, fleets of equipment, numerous trips to and from the construction site...in short, you face enormous costs.
TWO SOLUTIONS
IN-PLACE RECYCLING: Various pieces of equipment move as a single "train" which removes the existing pavement to a depth of 3'-4". This material is reclaimed and combined with an emulsion designed to build on the old pavement's beneficial properties. The "new " mix is then reapplied to the base, all within a matter of minutes.
| Program Benefits |
| • | Process saves time (up to 66% less); equipment (up to 50% less); raw materials (up to 60% less); manpower (up to 25% less); and to/from site transportation required (up to 25% less) |
| • | On-site sampling, lab research & follow-up |
| • | Rehabilitates removed asphalt with Suit-Kote's own rejuvenating agents, virgin aggregates & high float emulsions-for immediate reapplication |
| • | Single pass, 0 to 5" depth cut eliminates potholes, cracks, ruts, heavy pavement buildup & major surface irregularities |
| • | Restores proper curb line depth, grade & major slope requirements |
| • | Variable-speed, bi-directional cutting drum prepares range of textured subsurface to enhance reapplication |
| • | Increased mobility & maneuverability of equipment |
| • | On-board dust control, mixing hopper, and automated slope, grade & depth control |
| • | Reduces segregation |
| • | Wearing Course as required |
| It's Applications |
| • | Ideal for urban, residential, state & county route applications |
| • | Rods marred by potholes, wheel ruts, cracks & major structural problems |
| • | Ideal for returning built-up bridge underpasses to safe clearances; also reduces dangerous dead-load materials on bridges |
CENTRAL PLANT RECYCLING: This option involves transporting reclaimed material to central stockpile area for mixing. It offers most of the advantages of the In-Place system, plus:
| • | Extra-thorough mixing of reclaimed materials, rejuvenating agents & virgin aggregates |
| • | Allows for necessary base, sub-base, or drainage work |
| • | If grind depth exceeds reapplication depth, excess materials can be re-used elsewhere |
| |